More shiny things

Tuesday, January 13, 2009

Had to change the shower pan as the one we wanted (with the seat below) was a 4-5 week lead time, which is too long. So we went with a regular shower pan instead. The subway tile will be from floor to ceiling in the shower and should look very pretty. Nice and white. :)

We settled on a faucet, as well, and also chose the coordinating shower head and valve control. Although there were plenty that we liked, they were either too expensive or were the kind that would get lots of "wow, that's neat" comments now but "what were they thinking" comments in 15 years. I'm trying to stay as classic as possible. No crazy patterns or color schemes. No trendy this or that. The sink is as trendy as it's going to get and its design has a lot of elements from the classics of the past so I'm sure it will endure.

Clark's been working at his usual pace (speedy) and we'll probably have our first of the 3 inspections this week or next. I'll post more photos later tonight or tomorrow.

0 comment(s):

 
Everyone wants to be Irysh - by Templates para novo blogger